- Home
- Departments
- Development Services
- Fee Schedules
Fee Schedules
For additional information regarding fee schedules and how they will apply to your project please contact the Development Services Department at 830-798-7095.
A service charge of 3% will be applied to all credit card transactions.
New Residential Construction Building Permits
| Permit Type | Fee |
|---|---|
| Plan Review - 3,000 sq ft or less | $100 |
| Plan Review - 3,001 sq ft or more | $150 |
| *New Construction | $0.50/sq ft plus 10% per trade |
| Residential Building Permit Amendment | $50 |
*New construction Permits will now include all trade permits. These will not be separate permits.
Residential Remodel/Addition/Alteration Building Permits
| Permit Type | Fee |
|---|---|
| Plan Review | $50 |
| *Remodel/Addition/Alteration | $0.50/sq ft plus 10% per trade |
| Electrical | $100 |
| Plumbing | $100 |
| Mechanical *Remodel Permits will now include all trade permits. These will not be separate permits. | $100 |
Miscellaneous Residential Building Permits
| Permit Type | Fee |
|---|---|
| Residential Driveway/Flatwork | $100 |
| Residential Fence/Wall | $100 |
| Accessory Dwelling Unit | $0.50/sq ft plus 10% per trade |
| Residential Accessory Structure | $0.25/sq ft plus 10% per trade. Min permit fee is $50 |
| Roofing/Re-roofing | $100 |
| House Moving | $50 |
| Residential Land Disturbance (Cut and Fill) | $100 |
| Residential Land Clearing | $100 |
| Residential Floodplain Development Permit | $100 |
| Residential Floodplain Development Variance | $600 |
| Residential Boat Dock | $200 |
| Residential Irrigation | $100 |
| Residential OSSF System | $160 |
| Residential Swimming Pool | $150 |
| Residential Demolition | $50 |
| Mobile/Manufactured Home | $300 |
| Residential Temporary Use Permit | $300 |
| Tree Removal | $50 |
| Work without a Permit | Up to 3 times the fee |
Residential Inspections
| Inspection Type | Fee |
|---|---|
| New Residential/Remodel Re-Inspection (after 1st failed re-inspection) | $50 |
| New Residential/Remodel After-Hours Inspection | $100 |
New Commercial Construction Building Permits
| Permit Type | Fee |
|---|---|
| Plan Review - 10,000 sq ft or less | $200 |
| Plan Review - 10,001 sq ft to 30,000 sq ft | $300 |
| Plan Review - 30,001 sq ft or more | $450 |
| *New Commercial Construction | $5 per $1,000 value of construction |
| Electrical | $200 |
| Plumbing | $200 |
| Mechanical | $200 |
| Commercial Building Permit Amendment | $100 |
| *New Commercial Construction Permits now will include all trade permits |
Commercial Remodel/Addition/Alteration Building Permits
| Permit Type | Fee |
|---|---|
| Plan Review - 10,000 sq ft or less | $200 |
| Plan Review - 10,001 sq ft or more | $300 |
| Remodel/Addition/Alteration | $5 per $1,000 value of construction |
Miscellaneous Commercial Building Permits
| Permit Type | Fee |
|---|---|
| Commercial Driveway/Flatwork/Paving | $250 |
| Commercial Fence/Yard Wall | $150 |
| Commercial Land Clearing | $120 |
| Commercial Land Disturbance Permit (Grading/Cut and Fill) | $200 |
| Commercial Floodplain Development Permit | $150 |
| Commercial Floodplain Development Variance | $800 |
| Commercial Boat Dock | $300 |
| Commercial Roofing | $150 |
| Commercial Demolition | $100 |
| Commercial Irrigation | $30 per zone up to 10 zones + $5 per zone thereafter |
| Commercial OSSF System | $500 |
| Commercial Swimming Pool | $250 |
| Commercial Building Permit Amendment | $100 |
| Certificate of Occupancy | $100 |
| Commercial Temporary Use Permit | $300 |
| Work without a Permit | Up to 3 times the fee |
Commercial Inspections
| Inspection Type | Fee |
|---|---|
| New Commercial/Remodel Re-Inspection (after 1st failed re-inspection) | $100 |
| New Commercial/Remodel After-Hours Inspections | $100 |
Impact Fees - Effective May 1, 2024
| Meter Size (inch) | Water Fee | Wastewater Fee | Combined Total |
|---|---|---|---|
| 3/4 | $5,522.00 | $6,586.00 | $12,108.00 |
| 1 | $9,222.00 | $10,998.00 | $20,220.00 |
| 1.5 | $18,386.00 | $21,928.00 | $40,314.00 |
| 2 | $29,430.00 | $35,098.00 | $64,528.00 |
| 3 | $55,216.00 | $65,852.00 | $121,068.00 |
| 4 | $92,044.00 | $109,774.00 | $201,818.00 |
| 6 | $184,034.00 | $219,484.00 | $403,518.00 |
| 8 | $294,466.00 | $351,188.00 | $645,654.00 |
Impact Fees - Taking Effect November 1, 2025
| Meter Size (inch) | Water Fee | Wastewater Fee | Combined Total |
|---|---|---|---|
| 3/4 | $6,626.00 | $7,903.00 | $14,529.00 |
| 1 | $11,066.00 | $13,198.00 | $24,264.00 |
| 1.5 | $22,063.00 | $26,314.00 | $48,377.00 |
| 2 | $35,316.00 | $42,118.00 | $77,434.00 |
| 3 | $66,259.00 | $79,022.00 | $145,281.00 |
| 4 | $110,453.00 | $131,729.00 | $242,182.00 |
| 6 | $220,841.00 | $263,381.00 | $484,222.00 |
| 8 | $353,359.00 | $421,426.00 | $774,785.00 |
Water Tap and Connection Fees
| Meter Size (inch) | City Installed | Contractor Connection Fee (Water Meter set/install if tap exists) |
|---|---|---|
| 3/4 | $3,320.35 | $347.96 |
| 1 | $3,335.35 | $387.96 |
| 1.5 | Calculated by Public Works | Calculated by Public Works |
| 2 | $5,453.12 | $935.46 |
| 4 | $15,160.03 | Calculated by Public Works |
| 4 (Compound) | $15,160.03 | Calculated by Public Works |
| 6 | Calculated by Public Works | Calculated by Public Works |
| 8 | Calculated by Public Works | Calculated by Public Works |
All Taps 2-inch and Larger: Actual Cost
Wastewater Tap and Connection Fees
| Tap Size | City Installed | |
|---|---|---|
| Regular 4 inch | $2,073.91 | |
| Commercial 6 inch | $2,386.47 |
Utility Security Deposits (required to activate services)
| Meter Size (inch) | Residential | Residential Sprinkler | Commercial | Commercial Sprinkler |
|---|---|---|---|---|
| 3/4 | $150.00 | $50.00 | $150.00 | $150.00 |
| 1 | $200.00 | $0.00 | $200.00 | $200.00 |
| 1.5 | $250.00 | $0.00 | $250.00 | $250.00 |
| 2 | $500.00 | $0.00 | $500.00 | $500.00 |
| 3 | $575.00 | $0.00 | $575.00 | $575.00 |
| 4 | $700.00 | $0.00 | $700.00 | $700.00 |
| Permit Type | Fee |
|---|---|
| Attached Sign (Non-Illuminated) | $50 + $2/sq ft |
| Attached Sign (Illuminated) | $60 + $2/sq ft |
| Monument Sign (Non-Illuminated) | $50 + $2/sq ft |
| Monument Sign (Illuminated) | $60 + $2/sq ft |
| Monument Sign, Multi-Tenant (Non-Illuminated) | $150 + $2/sq ft |
| Monument Sign, Multi-Tenant (Illuminated) | $175 + $2/sq ft |
| Monolith Sign (Non-Illuminated) | $50 + $2/sq ft |
| Monolith Sign (Illuminated) | $60 + $2/sq ft |
| Freestanding/Pole Sign (Non-Illuminated) | $100 + $2/sq ft |
| Freestanding/Pole Sign (Illuminated) | $150 + $2/sq ft |
| Electronic Message Sign - Monument | $200 + $2/sq ft |
| Electronic Message Sign - Standard | $300 + $2/sq ft |
| Window Signage | $2/sq ft |
| Retaining Wall Sign & Wall Sign | $60 + $2/sq ft |
| Sign Reface | $30 |
| Development Sign | $500 annually |
| Directional Sign | $30 per sign or min. $50 permit fee |
| Temporary Sign | $50 |
| Temporary Sign Annual Permit(1) | $50 annually |
| Landmark Sign | $500 |
| Commercial Real Estate Sign | No Fee |
| Residential Real Estate Sign | No Fee |
| Commercial Contractor Sign | No Fee |
| Residential Contractor Sign | No Fee |
| Community or Public Service Sign | No Fee |
(1) Temporary Sign Annual Permit applies to feather flags, sandwich boards, and sandwich boards in Main Street District only.
A separate Electrical permit is required to be obtained by a licenses electrician for signs requiring electrical components to be constructed.
Any sign(s) erected without having first obtained a permit shall be subject to a penalty fee of three (3) times the base permit fee amount to obtain a Sign Permit.
| Type | Fee |
|---|---|
| Development Agreement or PDD Zoning - 0 to 5 Acres | $2,000 |
| Development Agreement or PDD Zoning - 6 to 10 Acres | $2,500 |
| Development Agreement or PDD Zoning - 11 to 15 Acres | $3,500 |
| Development Agreement or PDD Zoning - 16 to 20 Acres | $4,500 |
| Development Agreement or PDD Zoning - Over 20 Acres | $6,000 |
| Development Agreement or PDD Amendment | $2,000 |
| Zoning Map Amendment - 0 to 5 Acres | $500 |
| Zoning Map Amendment - 6 to 10 Acres | $765 |
| Zoning Map Amendment - Over 10 Acres | $1,015 |
| Conditional Use Permit | $500 |
| Zoning Variance | $500 |
| Special Exception | $515 |
| Administrative Exception | $100 |
| Master Planned Community Review | $500 + $30 per acre ($10,000 max) |
| Development Plat | $265 + $45 per lot or $35 per acre (whichever is more) |
| Preliminary Plat | $440 + $45 per lot |
| Final Plat | $415 + $45 per lot |
| Plat/Replat | $265 + $45 per lot |
| Minor Plat/Minor Replat/Amending Plat | $215 + $45 per lot |
| Subdivision Waiver and Suspension | $150 |
| Subdivision Plat Vacation | $265 |
| Street/Alley/Easement Abandonment | $250 |
| Site Plan Review - Residential - 3,000 sq ft or less | $50 |
| Site Plan Review - Residential - 3,001 sq ft or more | $150 |
| Site Plan Review - Commercial - 10,000 sq ft or less | $150 |
| Site Plan Review - Commercial - 10,001 sq ft to 30,000 sq ft | $300 |
| Site Plan Review - Commercial - 30,001 sq ft or more | $450 |
| Landscaping Replacement | $30 |
| Mitigation Fee - Downtown Parking Fee in Lieu | $9,500 per parking space |
| Mitigation Fee - Sidewalk Fee in Lieu | $6/sq ft |
| Mitigation Fee - Tree Replacement Fee in Lieu | $150 per caliper inch removed |
| Voluntary Annexation/ETJ Extension | $215 |
| Chapter 245 Determination (Vested Rights) | $200 + city attorney fees |
Standard Map
| Map | Digital Map | Hardcopy (No Orthoimagery) | Hardcopy (With Orthoimagery) |
|---|---|---|---|
| Marble Falls City Limit & ETJ | $0 | $15 | $20 |
| Street Map and Index | $0 | $15 | $20 |
| Subdivisions | $0 | $15 | $20 |
| Zoning | $0 | $15 | $20 |
| Floodplain | $0 | $15 | $20 |
| Future Land Use | $0 | $15 | $20 |
| Thoroughfare Plan | $0 | $15 | $20 |
Custom map
| Paper Size | Base Fee | Additional Copies | Digital Format (PDF) |
|---|---|---|---|
| 8.5 x 11 inches | $3 | $1 | Base fee not applicable. GIS analysis charges apply. |
| 11 x 17 inches | $7 | $2 | |
| 18 x 24 inches | $15 | $3 | |
| 24 x 36 inches | $20 | $4 | |
| 36 x 48 inches | $25 | $5 | |
| Add Orthoimagery.....................................$10 per map (hardcopies only) | |||
| No Orthoimagery.......................................No Fee | |||
| GIS Analysis..............................................$15 per 15 minute interval (always applicable) | |||